| DSCN0563.JPG 
  Box for the water heater.
 Comments(0)
 | DSCN0564.JPG 
  The water heater.
 Comments(0)
 | DSCN0565.JPG 
  Natural Gas Water heater.
 Comments(0)
 | DSCN0566.JPG 
  Temporarily, this will sit in the old bathroom area.  It will be moved to the new utility room once it's built.
 Comments(0)
 | 
DSCN0567.JPG 
  Although it should be sufficient, should the future residents of the house be obsessively addicted to extremely long hot showers, an additional unit will be added later.  Room will be set aside for this purpose.
 Comments(0)
 | DSCN0568.JPG 
  Final run has been sweated.  All below floor plumbing is now completed.
 Comments(0)
 | DSCN0569.JPG 
  The small stem will be the feed for the toilet tank.
 Comments(0)
 | DSCN0570.JPG 
  Comments(0)
 | DSCN0571.JPG 
  Comments(0)
 | DSCN0572.JPG 
  Temporarily, the hot water heater will sit upon these cinderblocks.
 Comments(0)
 | DSCN0573.JPG 
  Couplings will be added to these pipes next time and the remaining plumbing will be added.
 Comments(0)
 | DSCN0574.JPG 
  All plumbing currently above the downstairs floor level is considered to be permanant.  Plumbing below floor level will be temporary and will be redone at some point in the future as new fixtures are added.
 Comments(0)
 | DSCN0575.JPG 
  Comments(0)
 | DSCN0576.JPG 
  2x4's have been mounted perpendicularlly to the joists as this one span is uncomfortably large to support a 3/4" thick floor.
 Comments(0)
 | DSCN0577.JPG 
  Comments(0)
 | DSCN0578.JPG 
  Comments(0)
 | DSCN0579.JPG 
  Pipes have been secured to prevent rattling.
 Comments(0)
 | DSCN0580.JPG 
  Comments(0)
 | 