| DSCN3463.JPG 
  Comments(0)
 | DSCN3464.JPG 
  Comments(0)
 | DSCN3465.JPG 
  Dishwasher circuit on the left.  Plumbing for the sink.  Outlet for the sink disposal.
 Comments(0)
 | DSCN3466.JPG 
  Green tag.  We passed inspection.
 Comments(0)
 | 
DSCN3467.JPG 
  Comments(0)
 | DSCN3468.JPG 
  Comments(0)
 | DSCN3469.JPG 
  It's... getting full.  17 circuits total between the kitchen and laundry room.  The only remaining slots will be used for the compressor for the second air conditioner, which will be installed later.
 Comments(0)
 | DSCN3470.JPG 
  The laundry room window is now the proper color.  20 amp circuit for the washing machine, 30 amp 220V circuit for the dryer.
 Comments(0)
 | DSCN3471.JPG 
  Comments(0)
 | DSCN3472.JPG 
  Switches.. one for the overhead light in the laundry room, and another for the pantry.
 Comments(0)
 | DSCN3473.JPG 
  Where two of the three overhead lights are going to go.
 Comments(0)
 | DSCN3474.JPG 
  Comments(0)
 | DSCN3475.JPG 
  Insulated.  Gertie said it took them about 20 minutes total to do the entire job.
 Comments(0)
 | DSCN3476.JPG 
  More insulation.  Outlet at the lower left for... whatever.  Switch for outside light and a three-way switch for the overhead lights.  Single outlet circuit, probably for the microwave.
 Comments(0)
 | DSCN3477.JPG 
  Comments(0)
 | DSCN3478.JPG 
  Ethernet... of course.
 Comments(0)
 | DSCN3479.JPG 
  Comments(0)
 | DSCN3480.JPG 
  Comments(0)
 | DSCN3481.JPG 
  Comments(0)
 | DSCN3482.JPG 
  Gertie... quite happy with her new kitchen. :)
 Comments(0)
 | DSCN3483.JPG 
  Gertie's new haircut.  Completely unrelated to the kitchen, but nice none the less. :)