| dcp_1266.jpg 
  Most of the lumber gone now, all moved upstairs.
 Comments(0)
 | dcp_1267.jpg 
  Comments(0)
 | dcp_1268.jpg 
  Comments(0)
 | dcp_1269.jpg 
  The third joist has been nailed in, and now supports two 4x8 sheets of plywood.
 Comments(0)
 | 
dcp_1270.jpg 
  Comments(0)
 | dcp_1271.jpg 
  Two more joists and a third sheet.  New electrical wiring runs between the joists.
 Comments(0)
 | dcp_1272.jpg 
  Comments(0)
 | dcp_1273.jpg 
  Comments(0)
 | dcp_1274.jpg 
  Comments(0)
 | dcp_1275.jpg 
  All the knob & tube wiring has now been replaced with a modern, and significantly safer alternative.
 Comments(0)
 | dcp_1276.jpg 
  Here we connected the new wiring and the molex down to the outlets in the walls.  Enough slack remains here so when the walls downstairs get stripped, the new wiring will be pulled down to replace the old.
 Comments(0)
 | dcp_1277.jpg 
  Comments(0)
 | dcp_1278.jpg 
  Few problems that can't be solved with a drill, a hacksaw, and a hammer.
 Comments(0)
 | 
004pics&theme=0004pics&theme=0004pics&theme=0004pics&theme=0004pics&theme=0004pics&theme=0